1 Pre-set system Filter, Flow meter, Pressure regulator valve, Buffer and other accessories etc.
2 Dewatering system Double or Multi-tower skid, Electrical heater, Pipes and Control Cabinet and Valves etc.
3 CNG compressorsGroup Compressors system, Explosion-proof motor, Skid-mounted basement, Local gauges Cabinet, PLC Cabinet of random Spare parts and Special tools etc.
4 Priority/Sequence Control Panel Control panel and relevant valve and gauges etc.
5 Storage system Cylinder, high pressure valves and accessories etc.
6 Dispenser system Mass flow meter, high-pressure valve, Program controlled electromagnetic valve and double hoses.
7 Electric control system Alarming system when gas leaks, Distributing cabinet and other electronic components.